Consultancy Services For Detailed Engineering Design and Construction Supervision For Rejuvenation Of Songosongo Runway Pavement (1.05 Km Runway).
assignment name: Consultancy Services For Detailed Engineering Design and Construction Supervision For Rejuvenation Of Songosongo Runway Pavement (1.05 Km Runway).
Location within the Country: SongoSongo Island
Name of the Client: PanAfrican Energy
Address: Dar-es-salaam
Start date
[Month/year]: Feb 2016
Completion Date: Aug 2016
Detailed Narrative Description of Project:
Advanced Engineering Solutions was engaged by the PanAfrican Energy to carry out a study, Design and supervision for a suitable rejuvenation remedial work to be carried out at the Songosongo runway so as to ensure that the runway is complying with the requirements of ICAO as well as the aviation regulation as set out by TCRA which is an organ which is monitoring he aviation industry in Tanzania.
The runway was 1,050 m long x 18.50m wide.
Detailed Description of Actual Services provided by your staff:
Advanced Engineering Solution is in charge of:
Preparation of inception report
Materials investigation and preparation of materials report
Pavement design
Detailed engineering Design
Construction supervision
Preparation of Detailed Engineering design report
Preparation of bill of quantity
Preparation of contract documents
Consultancy Services for Rehabilitation and Upgrading of Zanzibar Airport.
Assignment name: Consultancy Services for Rehabilitation and Upgrading of Zanzibar Airport.
Location within the Country: Zanzibar
Name of the Client: Ministry of Communication and Infrastructure – Zanzibar
Address: P.O Box 260 Zanzibar
Start date
[Month/year]: 03/12
Completion Date:
09/13
Narrative Description of Project: the project provides for the rehabilitation of the existing 2460 m runway and extension of the runway by 560 m extending it to the total length of 3200 m. The pavement width to be upgraded to 60 m comprising 45 m of the carriageway and 15 m of shoulder rehabilitation involved placing 60 mm of binder course and 40 mm of wearing course. The airport is upgraded to conform to code 4E in line with ICAO requirements.
Description of Actual Services provided by your staff:
Advanced Engineering Solution was in charge of:
- Preparation and approval of Quality control and quality assurance plan
- Detailed engineering survey for quantity computation as well as quality control of checking location and elevations of runway, taxiways and apron [X, Y, Z]
- Geotechnical investigation for the design of the new parallel taxiways
- Implementation of Contractor’s quality control plan
- Review of pavement design
- Asphalt concrete mix design
- Geometrical design review and improvement for the geometrical features of the runway and taxiways.
- Preparation of various technical reports and correspondences including claims and value engineering proposals.
- Preparation of monthly report
- Management of laboratory which includes management of laboratory tests and field tests such as field density, concrete quality control test etc.
Consultancy Services for Rehabilitation and Upgrading of Bukoba Airport.
Assignment name: Consultancy Services for Rehabilitation and Upgrading of Bukoba Airport.
Location within the Country: Kagera Region
Name of the Client: Tanzania Airport Authority
Address: P.O Box 3013 Dar Es Salaam
Start date
[Month/year]: 11/11
Completion Date: 11/13
Narrative Description of Project: the project provides for new construction/upgrading/rehabilitation of the existing runway by placing 250 mm of the bituminous bound base, 120 mm of binder course and 45 mm of marshal asphalt wearing course. The airport is being upgraded from gravel to bituminous pavement and will be upgraded to CODE 3E in line with ICAO standards. The width of the airport pavement is 30 m. In addition to that, the project also involves the construction of the new terminal building, construction of a new apron, construction of subsoil drainage, and provision of electrometrical and mechanical components/art in the terminal building.
Description of Actual Services provided by your staff:
Advanced Engineering Solution was in charge of:
- Preparation and approval of Quality control and quality assurance plan
- Detailed Engineering survey and cross-sectioning of the runway for computation of the quantity
- Geotechnical investigation before terminal building construction
- Review of pavement design
- Asphalt concrete mix design
- Geometrical design review and improvement for the geometrical features of the runway and taxiways.
- Preparation of various technical reports and correspondences including claims and value engineering proposals.
- Carrying out detailed surveying for setting out the purpose as well as documenting all features for preparation of as-built drawings.
- Preparation of monthly report
- Reviewing and approving the Contractor’s quality assurance plan
Consultancy services for Supervision of construction of Passengers terminal III complex and associated Works & facilities at Julius Nyerere International Airport
Assignment name:
Consultancy services for Supervision of construction of Passengers terminal III complex and associated Works & facilities at Julius Nyerere International Airport
Location within the Country: 
Dar Es Salaam region
Name of the Client: Tanzania Airport Authority [TAA]
Address: P.O Box 18000 Dar Es Salaam
Start date
[Month/year]: 07/13
Completion Date: May 2020
Narrative Description of Project: the project involves the construction of passenger terminal III, the construction of a taxiway and a new apron.
Description of Actual Services provided by your staff:
Advanced Engineering Solution is in charge of:
- Preparation and approval of Quality control and quality assurance plan
- Design review of taxiway pavement, apron, terminal building
- Supervision of construction of drainage structures
- Review of pavement design
- Mix design of stabilized material and cement concrete
- Approval of all construction materials such as subgrade [G7 and G15], stabilized subbase [C1], crushed base [CRR] and Marshal asphalt concrete.
- Preparation of monthly report
- Reviewing and approving the Contractor’s quality assurance plan
Implementation of contractor’s environmental management plan
Consultancy Services for Supervision of Rehabilitation and Upgrading of Kigoma and Tabora Airports
Assignment name:
Consultancy Services for Supervision of Rehabilitation and Upgrading of Kigoma and Tabora Airports
Location within the Country:
Kigoma and Tabora, Tanzania
Name of the Client: Tanzania Airports Authority
Address:
Tanzania Airports Authority
P.O Box 18000 Dar es Salaam, Tanzania
Start date
[Month/year]: Sept/2017
Completion Date: Ongoing
Detailed Narrative Description of Project:
The main objective of the project is to carry out Supervision of proposed rehabilitation and upgrading works at Kigoma and Tabora Airports. The assignment includes supervision of the works to final completion including the defects liability period.
Detailed Description of Actual Services provided by your staff:
Advanced Engineering Solution is in charge of:
- Provide continual contract supervision services up to the completion dates.
- Quality Control
- Check and approve the contractors setting out of the works
- Measure or verify quantities of completed work and prepare monthly interim payment valuations, based on provisional quantities for progress payment approval by TAA.
- Provide continuous liaison with TAA or its appointed representative
- Documentation of site reports/activities
- Record all claims and submit timely recommendations thereon for consideration by TAA
- Management of ESMP in coordination with NEMC and all relevant parties
- Ensure regular and effective reporting and information sharing with TAA
- Check and compile as built drawings prepared by the Contractor
Preparation of supervision reports