Signing Ceremony: AES’s Director of Operations; Onesmo Mgoha (Right) AES’s Head of Engineering; Eng. Mtani Silasi Mtani (Left)

Advanced Engineering Solutions [AES] has signed a Contract with TANROADS for providing the Consultancy services for Supervision of Upgrading of Bugene – Kasulu (Benaco) – Kumunazi Road (128.5 Km) to Bitumen Standard, Lot 2: Bugene – Burigi Chato National Park Section (60Km).

The signing ceremony was held at TANROADS Headquarter office situated at 3rd Floor, Shabaani Robert Road/Garden Avenue Junction, Dar es Salaam witnessed by TANROADS Chief Executive; Mohammed Besta as Client’s Representative, AES’s Director of Operation; Onesmo Mgoha and AES’s Head of Engineering; Eng. Mtani Silasi Mtani as the Consultant’s Representatives. Advanced Engineering Solutions has already geared-up in undertaking the assignment for the successful realization of the desired project outcomes within the agreed timeframe

Leave a Reply

Your email address will not be published. Required fields are marked *