Location: Mwanza Urban,Nyamagana and ilemela district

Client: Tanroads,Mwanza.

Start date: 6TH JUNE 2021

Completion Date: 6TH JUNE 2022

Duration of the assignment: 12 MONTHS

 

Detailed description of the assignment:

The objective of the assignment is to carry out Feasibility Study, Environmental and Social ImpactAssessment and Detailed Engineering Design to cover the two roads’ sections with a total of 24.2 kmin Mwanza city.

Detailed Description of Actual Services provided by your staff:
Advanced Engineering Solution was in charge of:
1.Preparation of inception report
2.Feasibility Study including preliminary design, economic analysis and cost estimates
3.Preliminary Environmental and Social Impact Assessment (ESIA), Development
of Preliminary Resettlement Action Plan (RAP) and survey of properties to be
affected;
4.Detailed engineering design and cost estimates;
5.Detailed ESIA and RAP;
6.Preparation of Tender Documents.