Location within the Country: Tabora
Name of the Client: TANROADS – Headquarters
Start date: Dec. 2017
Completion Date: ongoing
Duration of Assignment: 36 Months
Name of Associated Consultant:
LEA International Ltd (Canada) in JV with LEA Associates South Asia Pvt. Ltd (India)
Detailed Narrative Description of Project:
The Government’s [of the United Republic of Tanzania] efforts to vitally link the significant Regions of Tabora and Katavi as manifested through the upgrading of the Tabora – Koga – Mpanda Road to bitumen standard is packaged with Lot 1 of Usesula – Komanga Section [108 Km], Sikonge Spur of 2.21 Km and Sikonge Town Section of 7.36 Km.
Advanced Engineering Solutions, in association [as a Sub-Consultant] with LEA International Ltd [Canada] in JV with LEA Associates South Asia Pvt. Ltd [India], is taking a weighty role in supervision of the said package. It is highly counted-on that after the completion of the works the initially far-fetched areas to-be connected by the section will be all-weather get-at-able.
Services Provided by Advanced Engineering Solutions:
1.Preparation and approval of Quality control and quality assurance plan
2.Supervision of construction of drainage structures
3.Traffic count and traffic analysis
4.Mix design of stabilized material and cement concrete
5.Approval of all construction materials such subgrade [G7 and G15], stabilized subbase [C1],
6.crushed base [CRR] and Marshal asphalt concrete
7.Preparation of monthly report
8.Reviewing and approving Contractor’s quality assurance plan
9.Implementation of contractor’s environmental management plan