Location within the Country: Morogoro , Tanzania
Name of the Client: TANROADS – Headquarters
Start date: March 2013
Completion Date: Aug 2017
Duration of Assignment: 24 Months
Name of Associated Consultant:
AARVEE Associates Architects Engineers & Consultants PVT LTD [India]
Detailed Narrative Description of Project:
The project involves construction of two bridges the main bridge being 384 m and minor relief bridge of 120 m and construction of approach road of 9.142 km. The project also required design review of bridges and road. The review of design includes review of bridge design, review of the road design which includes vertical and horizontal alignment design, pavement design, drainage structures, structural designs for flood control structure,
Services Provided by Advanced Engineering Solutions
1.Preparation and approval of Quality control and quality assurance plan
2.Bridge design review
3.Supervision of construction of drainage structures such as bridge, box culverts and pipe culverts
4.Review of pavement design
5.Mix design of stabilized material and cement concrete
6.Approval of all construction materials such subgrade [G7 and G15], stabilized subbase [C1], crushed base [CRR] and Marshal asphalt concrete.
7.Preparation of monthly report
8.Reviewing and approving Contractor’s quality assurance plan