Location within the Country: Babati, Manyara and the Dodoma – Iringa Border (Mtera Dam)

Name of the Client: TANROADS – Headquarters

Start date: June 2019

Completion Date: Ongoing

Duration of Assignment: 15 Months

Name of Associated Consultant, if any:Umar Munshi Associates (Pakistan)

Detailed Narrative Description of Project:
The Main objective of these consultancy services is to undertake Feasibility Study, Environmental & Social impact Assessment, Detailed Engineering Design and Preparation of Tender Documents for Construction of a Bridge and its Approach roads to Bypass Mtera Dam and the Babati town Bypass Road (15.5 km) to Bitumen Standard.

Detailed Description of Actual Services provided by your staff:
Advanced Engineering Solution was in charge of:
1.Preparation of inception report
2.Feasibility Study including preliminary design, economic analysis and cost estimates
3.Preliminary Environmental and Social Impact Assessment (ESIA), Development
of Preliminary Resettlement Action Plan (RAP) and survey of properties to be
affected;
4.Detailed engineering design and cost estimates;
5.Detailed ESIA and RAP;
6.Preparation of Tender Documents.