Location within the Country: Lindi Tanzaniza
Name of the Client: Lindi Municipal Council
Start date: June 2018
Completion Date: Nov 2018
Duration of Assignment:2 Months
Name of Associated Consultant:
N/A
Detailed Narrative Description of Project:
The Main objective of these consultancy services is Carrying out Feasibility Study, Detailed Engineering Design and Preparation of Tender Documents for Upgrading to Asphalt Concrete of Uhuru 0.6 KM, Msonobarini 0.40 KM, Makonde 0. 6KM Roads, Including Mchinga Road Approach and Double Surface Dressing of Rest House 0. 67 KM, Nkuruma 0.43, Amani 0.49, Jamaica1.7KM, Mpilipili 0.78 KM and Eilat 1.62 KM Roads. The Project involved the Preliminary Design of Pavement Design, Geometric Design, Drainage Structures and Preliminary Environmental and Social Impact Assessment.
Services Provided by Advanced Engineering Solutions:
1.Preparation of inception report
2.Preparation of Draft Feasibility Study report including;
3.Preliminary Design Report + Preliminary ESIA + Preliminary RAP
4.Preparation of Final Feasibility Study report including;
5.Preliminary Design Report + Preliminary ESIA + Preliminary RAP
6.Preparation of Draft Final Engineering Design Report including
7.Tender Documents, Detailed ESIA & RAP, Valuation report and cost estimates