Project Details

  • Project Name : Supervision of Construction of Mabatini Pedestrian Flyover [steel] Bridge in Mwanza Region.
  • Project Location :Mwanza, Tanzania
  • Start Date : 2013-03-06
  • Approximate Finish Date : 2013-09-18

Supervision of Construction of Mabatini Pedestrian Flyover [steel] Bridge in Mwanza Region.

The project involves supervision of construction of pedestrian overpass steel bridge with I-beam section, universal column and hollow steel section light.

Advanced Engineering Solution is in charge of:

  • Preparation and approval of Quality control and quality assurance plan
  • Approval of concrete mix design used for foundation construction
  • Supervision of erection of all bridge members
  • Approval of all construction materials such steel members, bolts and concrete
  • Detailing engineering survey for checking the elevation as well as the location of the bridge structure
  • Geotechnical investigation prior to construction of the bridge
  • Preparation of monthly report
  • Reviewing and approving Contractor’s quality assurance plan
  • Preparation of traffic management plan
  • Implementation of contractor’s environmental management plan