Project Details

  • Project Name : Detailed Engineering Design and Preparation of Tender Documents for Service Roads to bitumen Standard, Traffic and street Lights, and Pedestrian Overhead Bridge Along new Constructed Road of Mwenge – Tegeta Along New Bagamoyo Road [12.9 km].
  • Project Location :Dar-es-salaam,Tanzania
  • Start Date : 2013-08-01
  • Approximate Finish Date : 2014-04-01

Detailed Engineering Design and Preparation of Tender Documents for Service Roads to bitumen Standard, Traffic and street Lights, and Pedestrian Overhead Bridge Along new Constructed Road of Mwenge – Tegeta Along New Bagamoyo Road [12.9 km].

the project involved designing of 12.5 km of service road and designing one pedestrian bridge. The work also involved Pavement design capable of carrying 3-10 Million Equivalent Standard Axle, design of 12.9 km of road, geometrical design, and pavement design capable of carrying 3-10 Million Equivalent Standard axles, traffic analysis, hydraulic /hydrology analysis.

The project involved design of box culverts/bridges

The project also involved design of two steel pedestrian bridges having span of 43.6 m and 41.3 m [see in the inset picture, Tegeta pedestrian bridge].