Consultancy Services for Feasibility Study, Detailed Engineering Design and Preparation of Tender Documents for Construction of Godegode Bridge (80 m) and its approaches (6 km) along Mpwapwa – Makutano Jct – Pwaga Jct – Lumuma (Dom/Moro brd), R478

img

Project: Consultancy Services for Feasibility Study, Detailed Engineering Design and Preparation of Tender Documents for Construction of Godegode Bridge (80 m) and its approaches (6 km) along Mpwapwa – Makutano Jct – Pwaga Jct – Lumuma (Dom/Moro brd), R478

January 2020

img

img

 

 

Project: Consultancy Services for Feasibility Study, Detailed Engineering Design and Preparation of Tender Documents for Construction of Godegode Bridge (80 m) and its approaches (6 km) along Mpwapwa – Makutano Jct – Pwaga Jct – Lumuma (Dom/Moro brd), R478

 

Start date: January 2020
Finish date: July 2020
Consultancy Service Cost: USD 172,436.35

 

The Project involves the provision of Consultancy Services for Feasibility/Economic analysis, Detailed Engineering Design and Preparation of the Tender Documents for Construction of Godegode Bridge (80 m) and its approach roads (6 Km).The Godegode Bridge is designed to cross the Kinyasungwe River waters and will be the main link between the Mpwapwa town and the Godegode village. Upon completion of the design project (our current assignment) the Government through TANROADS Dodoma regional office will have a budget for Project execution.Furthermore, upon completion of the construction works there will be a boost on the economic activities with the vicinity of the Bridge location due to the reliable transportation that will enhance movement of people and goods and hence attaining the realization of the national development goals.

 